The results of three CPV module round robins are presented. Ten test labs around the world participated to the round robins in total. Each round robin used a different CPV module technology (Daido Steel, Soitec, Suncore). The data gathered at the test labs was used to test CSOC power rating procedures as basis for the IEC draft standard 62670-3. The deviation between the minimum and the maximum power output rated at the test labs was in average 4.4 % with a standard deviation of 1.8 %abs. This underlines that power ratings or CPV modules are reliable and reproducible. © 2016, American Institute of Physics Inc. All rights reserved.

Rating of CPV modules: Results of module round robins

Graditi, G.;Romano, A.;Cancro, C.;Fucci, R.;Roca, F.
2016-01-01

Abstract

The results of three CPV module round robins are presented. Ten test labs around the world participated to the round robins in total. Each round robin used a different CPV module technology (Daido Steel, Soitec, Suncore). The data gathered at the test labs was used to test CSOC power rating procedures as basis for the IEC draft standard 62670-3. The deviation between the minimum and the maximum power output rated at the test labs was in average 4.4 % with a standard deviation of 1.8 %abs. This underlines that power ratings or CPV modules are reliable and reproducible. © 2016, American Institute of Physics Inc. All rights reserved.
2016
9780735414242
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.12079/4950
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
social impact