This document reports the activities performed in the framework of the Task 1 of the Contract n. 8400017131 (Servizio di studio preliminare dei dispositivi antisismici del sistema di isolamento deIl'EPR) between ENEA and ENEL, consisting in: - an updated overview of the state-of-the-art of applications of seismic isolation in the world with particular regard to nuclear power plants; - a description of the most diffused seismic isolator typologies with particular regard to the most suitable ones for applications in nuclear power plants; - considerations about the most criticai and safety-related interface components to be introduced in a nuclear power plants with the adoption of seismic isolation; - an overview of the available worldwide standards concerning seismic isolation and proposals for their extension to isolated nuclear power plants; -description of procedures for in-service inspection, maintenance and replacement of isolators in nuclear power plants.

Available devices and related applications - Preliminary Study of Anti-seismic Devices of the EPR Seismic Isolation System

Forni, M.
2011-04-29

Abstract

This document reports the activities performed in the framework of the Task 1 of the Contract n. 8400017131 (Servizio di studio preliminare dei dispositivi antisismici del sistema di isolamento deIl'EPR) between ENEA and ENEL, consisting in: - an updated overview of the state-of-the-art of applications of seismic isolation in the world with particular regard to nuclear power plants; - a description of the most diffused seismic isolator typologies with particular regard to the most suitable ones for applications in nuclear power plants; - considerations about the most criticai and safety-related interface components to be introduced in a nuclear power plants with the adoption of seismic isolation; - an overview of the available worldwide standards concerning seismic isolation and proposals for their extension to isolated nuclear power plants; -description of procedures for in-service inspection, maintenance and replacement of isolators in nuclear power plants.
29-apr-2011
Rapporto tecnico;Ingegneria nucleare;Sismica
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.12079/5225
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
social impact