Within the frame of the European Fusion Technology Programme, the HE-FUS3 helium facility was selected for the execution of thermal-hydraulic experimental campaigns on the HCPB Blanket mock-ups. The studies for the DEMO HCPB Blanket design, for the 1997-1998, contemplates a task concerning the Out-of-Pile tests for the HCPB Test Blanket Module (TBM). One of the main objectives of the task is the qualification of the HE-FUS3 capability to perform tests both in normal and off-normal conditions.
Analytical Study with the ATHENA Code of the HCPB Blanket Design Experimental Activity on the He-FUS3 Facility
Meloni, P.
1998-09-07
Abstract
Within the frame of the European Fusion Technology Programme, the HE-FUS3 helium facility was selected for the execution of thermal-hydraulic experimental campaigns on the HCPB Blanket mock-ups. The studies for the DEMO HCPB Blanket design, for the 1997-1998, contemplates a task concerning the Out-of-Pile tests for the HCPB Test Blanket Module (TBM). One of the main objectives of the task is the qualification of the HE-FUS3 capability to perform tests both in normal and off-normal conditions.I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.