In this work we present the latest update on the construction of the TOP-IMPLART proton LINAC at the ENEA C.R. Frascati Accelerators Laboratory. TOP-IMPLART is a 150 MeV proton accelerator for protontherapy applications funded by Regione Lazio (Italy). We have successfully commissioned the first 3GHz LINAC structure reaching the energy of 11.6 MeV (from 7 MeV), demonstrating the first proton acceleration in a SCDTL structures at this energy. The second SCDTL LINAC has been tuned and brazed and in delivery to the installation site, the third one is under construction. Copyright © 2015 CC-BY-3.0 and by the respective authors.

Status of the TOP-IMPLART proton LINAC

Snels, C.;Vadrucci, M.;Surrenti, V.;Ronsivalle, C.;Picardi, L.;Bazzano, G.;Ampollini, A.;Nenzi, P.
2015-01-01

Abstract

In this work we present the latest update on the construction of the TOP-IMPLART proton LINAC at the ENEA C.R. Frascati Accelerators Laboratory. TOP-IMPLART is a 150 MeV proton accelerator for protontherapy applications funded by Regione Lazio (Italy). We have successfully commissioned the first 3GHz LINAC structure reaching the energy of 11.6 MeV (from 7 MeV), demonstrating the first proton acceleration in a SCDTL structures at this energy. The second SCDTL LINAC has been tuned and brazed and in delivery to the installation site, the third one is under construction. Copyright © 2015 CC-BY-3.0 and by the respective authors.
2015
9783954501687
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.12079/4356
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
social impact