This document is the Deliverable D49 for Work Package N. 4.1 (in the framework of PDSXADS: Preliminary Design Studies of an Experimental Acce1erator-Driven System), which analyzes the core reference cyc1e for a LBE (lead bismuth eutectic) cooled core coupled with a LBE windowless target. It is ordered in terms of stand-alone work units with a synopsis summarizing each unit.
Contractual Deliverable D49 (WP4.1) Core Reference Cycle Analysis far the LBE-Cooled XADS K. W. Burn, G. Glinatsis, E. Nava, V. Peluso, C. Petrovich, M. Sarotto, R. Tinti (FIS-NUC)
Burn, K.
2003-12-10
Abstract
This document is the Deliverable D49 for Work Package N. 4.1 (in the framework of PDSXADS: Preliminary Design Studies of an Experimental Acce1erator-Driven System), which analyzes the core reference cyc1e for a LBE (lead bismuth eutectic) cooled core coupled with a LBE windowless target. It is ordered in terms of stand-alone work units with a synopsis summarizing each unit.I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.