At the request of ENEA, OCAS will produce in the Metal Processing Center (group of equipment needed to lab simulate the steel making process) approx. 1 ton of 15x15 Ti stainless steel. The aim of the supply is • the production and reporting concerning the manufacturing process for the production of 15-15 Ti stainless steel plates, 20% CW • the delivery of 17 lab casts and the production of 15-15 Ti SS 20% CW plates, 15mm X 750mm X 250mm (about 1 ton) • the shipment of the plates to the C.R. ENEA Brasimone, Italy In this document, the production route is described and the results of the characterization tests on the lab material are summarized.
15x15 Ti production and Procurement
2012-09-18
Abstract
At the request of ENEA, OCAS will produce in the Metal Processing Center (group of equipment needed to lab simulate the steel making process) approx. 1 ton of 15x15 Ti stainless steel. The aim of the supply is • the production and reporting concerning the manufacturing process for the production of 15-15 Ti stainless steel plates, 20% CW • the delivery of 17 lab casts and the production of 15-15 Ti SS 20% CW plates, 15mm X 750mm X 250mm (about 1 ton) • the shipment of the plates to the C.R. ENEA Brasimone, Italy In this document, the production route is described and the results of the characterization tests on the lab material are summarized.File | Dimensione | Formato | |
---|---|---|---|
NNFISS-LP3-043.pdf
accesso aperto
Licenza:
Creative commons
Dimensione
2.84 MB
Formato
Adobe PDF
|
2.84 MB | Adobe PDF | Visualizza/Apri |
RdS-2012-045 Frontespizio.pdf
accesso aperto
Licenza:
Creative commons
Dimensione
116.38 kB
Formato
Adobe PDF
|
116.38 kB | Adobe PDF | Visualizza/Apri |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.