In the European fusion roadmap, reliable power handling has been defined as one of the most critical challenges for realizing a commercially viable fusion power. In this context, the divertor is the key in-vessel component, as it is responsible for power exhaust and impurity removal for which divertor target is subjected to very high heat flux loads. To this end, an integrated R&D project was launched in the EUROfusion Consortium in order to deliver a holistic conceptual design solution together with the core technologies for the entire divertor system of a DEMO reactor. The work package ‘Divertor’ consists of two project areas: ‘Cassette design and integration’ and ‘Target development’. The essential mission of the project is to develop and verify advanced design concepts and the required technologies for a divertor system being capable of meeting the physical and system requirements defined for the next-generation European DEMO reactor. In this contribution, a brief overview is presented of the works from the first project year (2014). Focus is put on the loads specification, design boundary conditions, materials requirements, design approaches, and R&D strategy. Initial ideas and first estimates are presented. © 2015 EURATOM
Conceptual design studies for the European DEMO divertor: Rationale and first results
Villari, R.;Rydzy, A.;Ramogida, G.;Porfiri, M.T.;Frosi, P.;Dongiovanni, D.;Crescenzi, F.;Cocilovo, V.;Visca, E.;Mazzone, G.
2016-01-01
Abstract
In the European fusion roadmap, reliable power handling has been defined as one of the most critical challenges for realizing a commercially viable fusion power. In this context, the divertor is the key in-vessel component, as it is responsible for power exhaust and impurity removal for which divertor target is subjected to very high heat flux loads. To this end, an integrated R&D project was launched in the EUROfusion Consortium in order to deliver a holistic conceptual design solution together with the core technologies for the entire divertor system of a DEMO reactor. The work package ‘Divertor’ consists of two project areas: ‘Cassette design and integration’ and ‘Target development’. The essential mission of the project is to develop and verify advanced design concepts and the required technologies for a divertor system being capable of meeting the physical and system requirements defined for the next-generation European DEMO reactor. In this contribution, a brief overview is presented of the works from the first project year (2014). Focus is put on the loads specification, design boundary conditions, materials requirements, design approaches, and R&D strategy. Initial ideas and first estimates are presented. © 2015 EURATOMI documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.