IFMIF-DONES is a powerful neutron irradiation facility for the study and qualification of materials planned as part of the European roadmap to fusion-generated electricity. Its main goal is to study properties of materials under severe irradiation in a neutron field similar to the one in a fusion reactor first wall. It is a key facility to prepare for the construction of the DEMO power plant envisaged to follow ITER. The decision to start the construction of IFMIF-DONES is expected imminent. In this paper we present and discuss several key technical studies and decisions to improve and optimize the engineering design of IFMIF-DONES which were carried out as part of the activities in the framework of the EUROfusion Early Neutron Source work package (2015-2020). The following topics are discussed in this paper: the new layout of the IFMIF-DONES SRF LINAC accelerator and high-energy beam transport line, 7Be impurity management approach for the lithium loop, a maintainable test cell concept, a revised layout of the access cell for the remote maintenance operations, and facilities for complementary experiments.
The IFMIF-DONES fusion oriented neutron source: evolution of the design
Bernardi, D.;Cappelli, M.;Favuzza, P.;Nitti, F. S.;Pinna, T.;
2021-01-01
Abstract
IFMIF-DONES is a powerful neutron irradiation facility for the study and qualification of materials planned as part of the European roadmap to fusion-generated electricity. Its main goal is to study properties of materials under severe irradiation in a neutron field similar to the one in a fusion reactor first wall. It is a key facility to prepare for the construction of the DEMO power plant envisaged to follow ITER. The decision to start the construction of IFMIF-DONES is expected imminent. In this paper we present and discuss several key technical studies and decisions to improve and optimize the engineering design of IFMIF-DONES which were carried out as part of the activities in the framework of the EUROfusion Early Neutron Source work package (2015-2020). The following topics are discussed in this paper: the new layout of the IFMIF-DONES SRF LINAC accelerator and high-energy beam transport line, 7Be impurity management approach for the lithium loop, a maintainable test cell concept, a revised layout of the access cell for the remote maintenance operations, and facilities for complementary experiments.File | Dimensione | Formato | |
---|---|---|---|
pdf.pdf
accesso aperto
Tipologia:
Versione Editoriale (PDF)
Licenza:
Creative commons
Dimensione
4.24 MB
Formato
Adobe PDF
|
4.24 MB | Adobe PDF | Visualizza/Apri |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.